Month: August 2019

114 River Blvd, Idalia

114 River Blvd, Idalia

Home was initially flooded by the Townsville Floods in February 2019. We undertook a complete strip out of the tiles, wall linings to half height, removal of kitchen and all cabinetry in bathrooms including bath and shower screens. This was to allow for the sanitization process and hygienic clean to take place. Once we had the Hygiene Clearance Certificate we commenced the rebuilding process.

New wall linings installed, carpentry fix out, new tiles supplied and laid, new kitchen installed including appliances and all new cabinetry installed, new bath and shower screens installed with all new tap wear and fittings also installed, then professional painting and professional clean to complete the full rebuild all ending with a satisfied client. As you can see by the photos the home is now basically a new home and the client is happy to have her home back in a sparkling new condition.

Services

Kitchen, Bathroom, Cabinetry, Clean

Year

2019


Share

76 Main Ave, Balmoral

76 Main Ave, Balmoral

QBCC Defect Claim - pertaining to defective construction practices wherein no positive waterproofing had been installed to lower level retaining walls, causing major water ingress during wet weather

Primary Contract - Deline all plasterboard linings to internal retaining walls and the application of a negative waterproofing system in conjunction with a drill and inject system, total lineal meterage 48lm, reinstallation of all wall linings and make good

Secondary contract - Landscaping and stormwater including a pump out pit to expel ground water redirected by negative waterproofing

Services

Kitchen, Bathroom, Cabinetry, Clean

Year

2019